40
Section 4 - In Roof Frame Installation
Mounting Lower Flashings
Starting from left side, screw lower left ashing (3) at left end to lower slat (2) with screws 4x30 (23).
Mount rest of lower ashing (4/5/6) continuing left to right, push ashing together and t with screw
(23) to lower wooden slat (2) where the overlap and on right end. (The ashings must interlock with
each other). When nished stick the seal strip at top of ashing edge (7) (covering the screw heads)
across total length.
3
4
4
5
7
23
5
6