RM Solar S Class 20 Pro Manual de instrucciones Pagina 46

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 88
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 45
45
Section 4 - In Roof Frame Installation
Mount Center Flashings
Place center ashing (11) on the lower collector edge and snap in starting from the bottom to the top.
Ensure the ashing snaps in tight, if required adjust the gap on the underside of the ashing. Secure
ashing into wooden block (26) using screws supplied (25).
N.B. Do not over tighten screw (25) this will deform the ashing.
11
25
11
26
Vista de pagina 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 87 88

Comentarios a estos manuales

Sin comentarios