6.4.9 Place the upper support wedge so that the distance between the lower slat (2) and
the upper wedge (7) is 1950 mm. The upper wedge must be supported by at least
two battens (Only use one 110mm screw to hold the wedge in place at this point)
6.4.10 Seal strip: Stick the seal strip (6) along the whole edge of the lower ashing (3) (4)
(5). Place the panels and align them. The distance on each side of the eld should
be 100mm. It is important to check diagonal measurements. A = B.