6.4.19. Using the nails and clips shown below (1), secure the side ashings to the tile
battons by hooking the clips over the outside edge of the ashings and nailing into
the batton as shown below (2)
6.4.20. Fix another timber rail (not supplied) across 6.4.21. Paste the adhesive backed
the top of the array, 280mm above the bib black strip along the top of
ashing support rail xed earlier. panels and ashing.
See gure below.
6.4.22. Screw the wind retaining rail on the timber rail